Dogger Bank Wind Farm

We're building the world's largest offshore wind farm.
On behalf of the three joint venture partners, SSE is currently building the 3.6GW Dogger Bank Wind Farm.
The world-leading project under construction in the North Sea more than 130km off the North East coast of England is a joint venture between SSE (40%), Equinor (40%) and Vårgrønn (20%).
Dogger Bank is being built in three 1.2 GW phases: Dogger Bank A, B and C. When fully complete, it will be capable of powering up to 6 UK million homes annually^, delivering homegrown, affordable, and secure clean energy to UK consumers.
In addition to the three phase Dogger Bank project, SSE Renewables and Equinor are progressing proposals to develop a potential fourth phase, Dogger Bank D. For more information please click here.
Number of wind turbines in each phase
Delivering for people and businesses
Dogger Bank Wind Farm is fully committed to supporting the UK offshore wind supply chain. To date we estimate more than 2,000 UK roles have been created or supported in relation to the construction and operation of the wind farm.
"Dogger Bank Wind Farm is a world-leading development pushing the boundaries of offshore wind development. We’re incredibly proud to say Dogger Bank Wind Farm is playing a key role in delivering the ambition to increase UK supply chain capacity and capability. Through our support for the local supply chain we’re harnessing skills and expertise in the North East of England and delivering long-term benefits in the UK’s offshore wind sector."
Olly Cass, SSE Renewables Project Director for Dogger Bank Wind Farm
SSE Renewables is leading on the construction and delivery of all three phases and Equinor will operate Dogger Bank on completion for its anticipated lifetime of up to 35 years. Vårgrønn provides specialist offshore wind expertise to the project. Over 400 long-term roles have been created locally to support the operations and maintenance of the wind farm.
A Nationally Significant Infrastructure Project
Dogger Bank Wind Farm was granted consent as a Nationally Significant Infrastructure Project in 2015 and successfully secured 15-year contracts (CfDs) for 3.6GW of new offshore wind energy in the UK Government’s auction for low carbon power in 2019.
Dogger Bank A and Dogger Bank B reached financial close in November 2020 at competitive terms underlining the attractiveness of the UK offshore wind assets and the confidence in the joint venture, while Dogger Bank C reached financial close in December 2021.
Taken in aggregate, reaching Financial Close on all three phases of Dogger Bank Wind Farm is the largest offshore wind project financing to date globally.
Construction is underway
We're utilising some of the world’s largest wind turbines and the world's largest installation vessel to deliver Dogger Bank.
We're installing one of the most powerful offshore wind turbines in operation today, GE’s Haliade-X, the first of which have been installed and which began generating electricity in October 2023.
Each Haliade-X turbine has a power output of up to 14MW and one rotation of the turbine blades can power one UK home for more than two days.
We are using the world’s largest jack-up installation vessel, the Voltaire operated by Jan de Nuul. This state-of-the-art vessel has a lifting capacity of 3,000 tonnes.
The UK's first offshore wind HVDC connection
The electricity generated by the turbines at Dogger Bank, which are between 130km and over 200km from shore, will be transmitted to shore via subsea cables.
Due to the distance of each of the phases offshore, Dogger Bank will be the first wind farm in the UK to utilise an HVDC connection. More typically used on interconnectors to transfer power between countries, the HVDC connection will ensure the energy being transmitted over the long distances from Dogger Bank offshore to the onshore grid connections in England’s East Riding and Teesside will be achieved efficiently while minimising losses.
Approximate size by phase
Distance from shore at nearest point
Dogger Bank A is around 515km² in size and is 131km from shore at its closest point. Dogger Bank B is the largest in area with a size of 599km² and is also 131km from shore at its nearest point.
The electricity from both comes ashore via subsea cables at Ulrome, in the East Riding area of Yorkshire, connecting to underground cables for a further 30km to the Creyke Beck substation near Cottingham, where the electricity joins the national grid.
Dogger Bank C is around 311km² in size and at its closest point is 196km from shore. The project connects to the national grid at the existing Lackenby Substation in Teesside.
Locally designed and sustainable O&M Base
The Port of Tyne was selected as the location of the new multi-million-pound Operations and Maintenance (O&M) Base that serves what will be the world’s biggest offshore wind farm.
The locally designed and sustainable O&M Base is the heart of Dogger Bank operations. It serves as the main hub for operating Dogger Bank and is home to around 400 employees. Some roles are based onshore, such as planners, engineers and management, while other roles such as wind turbine technicians are based offshore at the wind farm itself, living for two weeks at a time on specially-commissioned vessels over 130km out to sea.
As well as offices and a warehouse to store wind farm spare parts, the Base includes a new quay for the state-of-the-art Service Operations Vessels (SOVs) that provide accommodation and transport for technicians to and from the wind farm. Vessels come to the port twice a month for resupply and crew change.
Working with international design practice Ryder Architecture, headquartered in Newcastle, operations lead Equinor designed the O&M Base to be built using environmentally friendly materials. EV chargers, solar panels and efficient heating systems have been included to ensure the facility has a low carbon impact.
Dogger Bank Community Funds
Through the Dogger Bank Wind Farm, £1 million has been invested in key communities during construction, with a commitment to invest a further £25 million during operations.
A key focus for the fund will be supporting young people in the area by investing in STEM activities (Science, Technology, Engineering and Mathematics) and scholarships. Money is also available to support local community groups.
Click here to find out moreVisit Dogger Bank's dedicated website
Visit doggerbank.com| More information | |
| Project documents/library | https://doggerbank.com/downloads/Creyke-Beck-Consents-Documents.zip https://doggerbank.com/downloads/Teesside-A-Consent-Documents.zip |
| Contact details | info@doggerbankwindfarms.com |
^ Quoted 6.42 million homes powered per annum claim based on latest Typical Domestic Consumption Values (TDCV) at medium consumption, 2,700kWh per household; Ofgem, May 2023), typical 55% wind load factor, and projected installed capacity of 3.6GW.